Integration
We can also install the control panels onto your equipment and undertake the integration wiring. The Panel Build team would be responsible for:
- The installation of the control panel onto the machine/equipment
- The integration wiring
- Powering up the machine, undertaking an IO check and checking the emergency stop network is valid
- Generating the sign off electrical checks and making the machine/equipment ready for the software install
During the assembly stage of the project, the build documentation acts as the ‘Master Set’ and the team marks any agreed changes or revisions onto the drawings. On completion of the build, the documentation set is passed back to the design office for the updates to be formally recorded before the final documentation is released.